Projects: Abercrombie & Fitch factory Outlet



Brief                

The design and installation of mechanical and electrical services in new concept store in a busy retail operational out of town retail centre. Installation carried out with minimum disruption to other trading store whilst maintaining full access to both the general public and other outlets.

Electrical Works

Make the arrangement with the supply authority for the electrical supply service upgrade including metering connection and the same maintaining the supply to the site during construction. Installation of main distribution board along with contactor controlled sub distribution board for sales area services.

Construction

Preparation and installation of containment services for the requirement of main and sub main cabling throughout the store, at the same time co-coordinating with lighting layouts and Mechanical services.

General services

Designing the lighting support system to achieve the required lighting grid spacing with the correct fixing details to the roof structure to avoid deflection and obtaining desired lighting effect. Small power services to tills, music system and essential services.

Fire Alarm System

Working with the centre to provide a fully comprehensive, addressable fire alarm system at the same time integrating with the code of practice for the centre. Providing control and shut down interfaces for the HVAC plant, music and internal air condition units.

Mechanical works

Designing of the air conditioning and duct work services along with plumbing services to provide a well balance operational system with minuim maintenance with full control interface with remote monitoring and control.

Construction

Preparation of scheme design drawing and information packs on all plant items prior to installation. Control diagrams with full explanation of the system parameters and interface control equipment. Fully co-ordination installation drawings with all other services including pipe works runs for the air conditioning units.

Commissioning

On completion of the installation all statuary certification being provided before the handover of the project to the client. Independent reports provided for the complete balancing of the Mechanical services. A full and precise operation and maintenance manual issue for both services.

  • Locaton: Ashford
  • Duration: 3 Months
  • Completed: 30/09/2012