Projects: Hollister



Brief:

The design and installation of the mechanical and electrical services for the new store at the same time as refurbishment works were being carried by the landlord in the centre. Working with the landlord construction team to maintain full access for the general public and other contractors.

Electrical Works

Installation works carried by our own install team complying with the local electrical regulations with independent electrical testing of system in order provide correct certification on completion of the project.

Construction

Preparation of the coordinated services drawings from the client initial design concept drawings and issuing to all relevant install teams.

Install support systems for combine M & E services to increase the speed of install to meet with the program time frame.

General Service.

Installation of a purpose built distribution panel board complete with RCD and DP mcb operations to comply with regulations.

Basket tray installed with copper earth cabling clapped at suitable point along the entire basket tray route.

Lighting and small power services installed as required with remote control function.

Fire Alarm System

Working with the centre preferred specialist to install a fully addressable interface system complete with smoke extract system controls. All works under the supervision of our onsite install team.

Mechanical services

Design and adaption of the existing in store mechanical service and the smoke extract plant and shutters. All systems being interface with the landlord controls for smoke extract and plant shut down.

Preparation of the scheme layout drawings, fully co-ordinated with the air condition systems and controls.

Construction

Installation being a mixture of own mechanical install team and local landlord specialist.

All working together to minimize dual bracket installation and to achieve the install as per the program.

Commissioning

Commissioning of the Smoke vent system, duct work and air conditioning systems prior to hand over to the client.

Full demonstration of all systems to the landlord and providing fully independent certification for acceptance of bot the landlord and client.

 

  • Locaton: Vienna, Austria
  • Duration: 4 Months
  • Completed: 27/09/2012