Brief

To install a fully integrated power, lighting, display lighting and mechanical services in to a conceal box construction. All systems being totally automated, lighting, power and HVAC back to the USA.

Electrical works

Installation of mains and sub circuit distribution consisting of FP200 type cabling installed on basket tray support system, all fully installed and tested prior to the installation of the fixed ceiling grid. Agreeing all access points with in the sales to meet maintenance and CDM requirements but at the same time minimizing the effect on the finished ceiling.

Construction

To facilitate the smooth install for the complicated M & E services within the sale area ceiling void, we held construction meetings to co-ordinate the above ceiling works and agree time scales prior to the project commencement. Fully coordinated drawings issued along with information packs for all equipment to be installed.

General services

Installation of client cabinet display lighting and front entrance video wall system. Supply and install UPS back up and bypass switch system for the tills and video wall systems. Small power services to till, music system and essential services. Providing a fully comprehensive, addressable fire alarm system with integrations in to the landlord system complete with all the required shut down I/O relays.

Mechanical Works

HVAC systems designed around the landlord’s available LPH and CWS water services, all installed on a purposed made plant gantry at high level in the rear admin area of the store. Split ACU’s being utilized for the storage area of the store.

Construction

Preparation of the scheme drawing and information packs, followed by co-ordination meetings to plan and agree install dates. Carry witness pressure testing of the systems prior to final connection to the landlord services. Full commissioning of systems with independent report being provided to validate the system. 

  • Locaton: Stratford
  • Duration: 3 Months
  • Completed: 15/05/2012